Commissioning
6.4 Commissioning via PDM
46
SONO 3500 CT
Operating Instructions, 07/2019, VI.SH.P2.02
Call up indication:
When output B is configured as "call-up", the output is activated by an alarm condition and
remains on until it is manually reset via communication interface and the PDM program (or
via manually power down of the device).
A new alarm will not activate a "call-up" function if the "call-up" function is still active from a
previous alarm.
6.4.8
Checking the operation readiness
All parameters are now set and defined according to the application.
1. Select: "Device"
→ "Download to device..." to download the parameters to the device.
Note
Before downloading the parameters, check that all listed data are loaded or changed and
in accordance with the application requirements.
2. Select "Execute even if the device TAG does not match the project data TAG." and click
"OK" to download all changes from the table to the device.
View process values
The system is now ready for normal operation.
1.
Select "View" → "Display" to see all measured process v
alues.
2. Verify that the fields show the expected values.
Содержание SONO 3500 CT
Страница 1: ...Ultrasonic Flowmeter Operating Instructions SONO 3500 CT 07 2019 Edition ...
Страница 2: ......
Страница 8: ...Table of contents 6 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 14: ...Introduction 1 5 Further Information 12 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 38: ...Electrical connection 5 5 Sealing of SONO 3500 CT 36 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 50: ...Commissioning 6 4 Commissioning via PDM 48 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 54: ...Functions 7 4 Hardware key 52 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 64: ...Service and maintenance 8 7 Battery disposal 62 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...