Installing/Mounting
4.2 Sensor installation
22
SONO 3500 CT
Operating Instructions, 07/2019, VI.SH.P2.02
Valves and pumps
Valves
L2: Min. 10 x pipe diameter, fully open valve
L1: 3 x pipe diameter
Pumps:
L2: Min. 20 x pipe diameter
L1: 3 x pipe diameter
Orienting the sensor
Horizontal orientation, terminal box upwards or downwards
In horizontal installation avoid any upward/downward position of the transducers.
Precautions
Avoid installation at the highest point in the system because air bubbles will be trapped in
flowmeter.
Avoid installation at a point where there is a free outlet after flowmeter.
Содержание SONO 3500 CT
Страница 1: ...Ultrasonic Flowmeter Operating Instructions SONO 3500 CT 07 2019 Edition ...
Страница 2: ......
Страница 8: ...Table of contents 6 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 14: ...Introduction 1 5 Further Information 12 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 38: ...Electrical connection 5 5 Sealing of SONO 3500 CT 36 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 50: ...Commissioning 6 4 Commissioning via PDM 48 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 54: ...Functions 7 4 Hardware key 52 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...
Страница 64: ...Service and maintenance 8 7 Battery disposal 62 SONO 3500 CT Operating Instructions 07 2019 VI SH P2 02 ...