3
|
Components
Service manual
46
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01E – 2023.01
3 Components
CAUTION
When replacing a component ALWAYS make sure the correct spare part for your unit
is installed.
3.1 4-way valve
3.1.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a mechanical check of the 4-way valve
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
111].
DANGER: RISK OF BURNING/SCALDING
The coil gets hot while energized. Wait for it to cool down.
2
Verify that the screw is firmly fixing the coil to the valve body.
3
Check if any damage or burst is present.
Is the 4‑way valve coil firmly fixed and
not visually damaged?
Action
Yes
Perform an electrical check of the 4‑way
valve, see
46].
No
Fix or replace the 4‑way valve coil, see
To perform an electrical check of the 4-way valve
1
First perform a mechanical check of the 4-way valve, see
46].
2
Unplug the 4-way valve connector from the appropriate PCB.
3
Measure the resistance of the 4-way valve coil between the pins of the 4-way
valve connector.
Result:
The measured value must be 46 Ω ± 10%.
Is the measured value correct?
Action
Yes
Continue with the next step.
No
Replace the 4‑way valve coil, see
Содержание FTXP20-71L
Страница 190: ......
Страница 191: ......
Страница 192: ...ESIE18 01E 2023 01 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...