3
|
Components
Service manual
57
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01E – 2023.01
Compressor motor winding current
measurements are correct?
Action
Yes
Perform an insulation check of the
compressor, see
No
Preventively replace the compressor,
see
To perform an insulation check of the compressor
Prerequisite:
First perform an electrical check of the compressor, see
52].
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Before proceeding:
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.
2
Remove the cover of the compressor wire terminals.
a
a
Compressor wire terminals cover
3
Disconnect the Faston connectors from the compressor wire terminals U, V
and W.
INFORMATION
Note the position of the Faston connectors on the compressor wire terminals to
allow correct connection during installation.