3
|
Components
Service manual
72
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01E – 2023.01
b
c
c
d
e
a
a
Expansion valve coil
b
Metal bracket
c
Nipple
d
Notch
e
Expansion valve body
2
Route the expansion valve coil harness towards the appropriate PCB.
3
Connect the expansion valve coil connector to the appropriate PCB.
WARNING
When reconnecting a connector to the PCB, make sure to connect it on the correct
location and do NOT apply force, as this may damage the connector or connector
pins of the PCB.
4
Fix the expansion valve coil harness using new tie straps.
5
Install the insulation cap on the expansion valve coil (if applicable).
Is the problem solved?
Action
Yes
No further actions required.
No
63] of the expansion
valve and continue with the next
procedure.
3.4 High pressure switch
3.4.1 Checking procedures
To perform an electrical check of the high pressure switch
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Recuperate the refrigerant from the refrigerant circuit, see
2
Fill the refrigerant circuit with nitrogen until pressurized just below operating
pressure of the high pressure switch.
Содержание FTXP20-71L
Страница 190: ......
Страница 191: ......
Страница 192: ...ESIE18 01E 2023 01 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...