
Si12-411A
Outdoor Unit (50 / 52 / 58 / 68 / 75 Class)
Removal Procedure
251
2.5
Removal of
Sound Insulation
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove 5 screws of
the right side panel.
2
Remove 2 screws of
the partition board, and
remove the board.
3
Remove the noise
insulation (top, outer
and inner).
Содержание FTKE25BVM
Страница 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Страница 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Страница 7: ...Si12 411A vi Table of Contents...
Страница 67: ...Specifications Si12 411A 56 Specifications...
Страница 81: ...Printed Circuit Board Connector Wiring Diagram Si12 411A 70 Printed Circuit Board Connector Wiring Diagram...
Страница 131: ...Instruction Si12 411A 120 System Configuration CDK X D 25 35 50 60 C Names of parts Indoor Unit 3 6 8 9 10 7 1 4 5 2...
Страница 173: ...Instruction Si12 411A 162 System Configuration...
Страница 227: ...Check Si12 411A 216 Service Diagnosis...
Страница 268: ...Si12 411A Others 257 Part 8 Others 1 Others 258 1 1 Test Run from the Remote Controller 258 1 2 Jumper Settings 259...
Страница 295: ...Si12 411A iv Index...
Страница 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...