
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
229
1.4
Removal of
PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the controller
PCB
1
Release the tab of the
electrical box, and open
the terminal board.
2
Disconnect each
connector of the
terminal board.
3
Unscrew 1 screw and
release two tabs to
remove the PCB
Содержание FTKE25BVM
Страница 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Страница 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Страница 7: ...Si12 411A vi Table of Contents...
Страница 67: ...Specifications Si12 411A 56 Specifications...
Страница 81: ...Printed Circuit Board Connector Wiring Diagram Si12 411A 70 Printed Circuit Board Connector Wiring Diagram...
Страница 131: ...Instruction Si12 411A 120 System Configuration CDK X D 25 35 50 60 C Names of parts Indoor Unit 3 6 8 9 10 7 1 4 5 2...
Страница 173: ...Instruction Si12 411A 162 System Configuration...
Страница 227: ...Check Si12 411A 216 Service Diagnosis...
Страница 268: ...Si12 411A Others 257 Part 8 Others 1 Others 258 1 1 Test Run from the Remote Controller 258 1 2 Jumper Settings 259...
Страница 295: ...Si12 411A iv Index...
Страница 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...