
Si12-411A
Outdoor Unit (80 / 90 Class)
Removal Procedure
227
12
Take off the thermistor
presser spring, and
remove the thermistor.
Place the thermistor so that
its end comes up to the end
of the presser spring.
Be careful not to lose the
presser spring for the
discharge pipe thermistor.
3. Removing the electrical
box
1
Remove 2 screws of
the electrical box.
2
Turn the electrical box
up side down halfway,
and disconnect the
thermistor lead wire
from the hook.
Step
Procedure
Points
Содержание FTKE25BVM
Страница 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Страница 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Страница 7: ...Si12 411A vi Table of Contents...
Страница 67: ...Specifications Si12 411A 56 Specifications...
Страница 81: ...Printed Circuit Board Connector Wiring Diagram Si12 411A 70 Printed Circuit Board Connector Wiring Diagram...
Страница 131: ...Instruction Si12 411A 120 System Configuration CDK X D 25 35 50 60 C Names of parts Indoor Unit 3 6 8 9 10 7 1 4 5 2...
Страница 173: ...Instruction Si12 411A 162 System Configuration...
Страница 227: ...Check Si12 411A 216 Service Diagnosis...
Страница 268: ...Si12 411A Others 257 Part 8 Others 1 Others 258 1 1 Test Run from the Remote Controller 258 1 2 Jumper Settings 259...
Страница 295: ...Si12 411A iv Index...
Страница 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...