
Outdoor Unit (80 / 90 Class)
Si12-411A
224
Removal Procedure
2. Remove each wire harness
1
Disconnect 4
connectors of the
electronic expansion
valve lead wires.
When reconnecting, make
sure to match the wire to the
correct connector.
2
Remove the four way
valve connector
S80
.
3
Remove the connector
S93
for liquid pipe
thermistor.
Step
Procedure
Points
Connector
Electronic
expansion
valve No.
Harness
length
S20
(White)
EVA
630
S21
(Red)
EVB
730
S22
(Blue)
EVC
825
S23
(Yellow)
EVD
940
Содержание FTKE25BVM
Страница 1: ...C Series Applied Models zInverter Multi Cooling Only zInverter Multi Heat Pump Si12 411A...
Страница 6: ...Si12 411A Table of Contents v Index i Drawings Flow Charts v...
Страница 7: ...Si12 411A vi Table of Contents...
Страница 67: ...Specifications Si12 411A 56 Specifications...
Страница 81: ...Printed Circuit Board Connector Wiring Diagram Si12 411A 70 Printed Circuit Board Connector Wiring Diagram...
Страница 131: ...Instruction Si12 411A 120 System Configuration CDK X D 25 35 50 60 C Names of parts Indoor Unit 3 6 8 9 10 7 1 4 5 2...
Страница 173: ...Instruction Si12 411A 162 System Configuration...
Страница 227: ...Check Si12 411A 216 Service Diagnosis...
Страница 268: ...Si12 411A Others 257 Part 8 Others 1 Others 258 1 1 Test Run from the Remote Controller 258 1 2 Jumper Settings 259...
Страница 295: ...Si12 411A iv Index...
Страница 298: ...Si12 411A Printed in Singapore 03 2005 AK COS...