CyberOptics Corporation
127
Conveyor Components
13. Align to a gap of 5 mm between the stop spacer and the top cap. Tighten the wing nut at
6kgf.
Figure 97.
Gap between stop spacer and Top cap
Figure 98.
Relocation of mechanical board stop completed
14. Tidy the cable routing with cable tie onto the cable mount.
Figure 99.
Cable Routings
15. Reset the conveyor offset after the relocation of the mechanical board stop is completed. For
more information, refer to the section “
To reset the conveyor offset settings
Top Cap
Stop spacer
Содержание SE505
Страница 1: ...SE505 Hardware Manual ...
Страница 6: ...Contents vi SE505 Hardware Manual ...
Страница 10: ...x SE505 Hardware Manual ...
Страница 11: ...CyberOptics Corporation 1 Safety Safety Guidelines 2 Compliance 7 Safety and Conformity Labeling 8 ...
Страница 72: ...Chapter 3 Installation 62 SE505 Hardware Manual ...
Страница 168: ...Chapter 4 Replacing Components and Preventive Maintenance 158 SE505 Hardware Manual ...
Страница 180: ...Index 170 SE505 Hardware Manual ...