CyberOptics Corporation
105
Conveyor Components
Replacing the Conveyor Clamp Cylinder
Use this procedure to replace the clamp cylinders located on the right and left sides of both the
front and back conveyor rails. This procedure can be performed with access to the left/right of
the machine in production line. This section shows the procedure performed when the machine
is not in production line.
Parts
Conveyor Clamp Cylinder
8000517 Teflon Tape
➢
To replace the conveyor clamp cylinder
1. Turn off the air supply by turning the air shut-off valve to the horizontal position.
Figure 67.
Air Shut-Off Valve
2. Disconnect the two air fitting assemblies from the side of the conveyor clamp cylinder.
Note:
Mark the connection placement for each of the assemblies
.
Figure 68.
Conveyor Clamp Cylinder
i
Note:
For Parts Replacement, contact CyberOptics for part numbers.
Air shut-off valve
SIDE VIEW
Conveyor clamp cylinder
Conveyor clamp
cylinder screw
Hall effect
switch
Hall effect
switch screw
Shoulder
screw
Содержание SE505
Страница 1: ...SE505 Hardware Manual ...
Страница 6: ...Contents vi SE505 Hardware Manual ...
Страница 10: ...x SE505 Hardware Manual ...
Страница 11: ...CyberOptics Corporation 1 Safety Safety Guidelines 2 Compliance 7 Safety and Conformity Labeling 8 ...
Страница 72: ...Chapter 3 Installation 62 SE505 Hardware Manual ...
Страница 168: ...Chapter 4 Replacing Components and Preventive Maintenance 158 SE505 Hardware Manual ...
Страница 180: ...Index 170 SE505 Hardware Manual ...