Chapter 4
:
Replacing Components and Preventive Maintenance
126
SE505 Hardware Manual
10. Re-assemble the stop spacer and align the flange with the top edge properly with Allen key
No. 2.5. Ensure that the flange is close to the cylinder top edge. Apply loctite to the bolts.
Figure 94.
Stop spacer assembly
11. Prepare the left side conveyor with two thumb screws, two slot nuts and one cable mount
fixed up as shown in Figure 95.
Figure 95.
Left side conveyor rail assembly
12. Mount the completed stopper bracket assembly to the left side conveyor rail. Tighten with
wing nut.
Figure 96.
Mounting stopper bracket assembly
Slot nuts x 2
Thumb screws x 2
Cable
Mount x 1
Содержание SE505
Страница 1: ...SE505 Hardware Manual ...
Страница 6: ...Contents vi SE505 Hardware Manual ...
Страница 10: ...x SE505 Hardware Manual ...
Страница 11: ...CyberOptics Corporation 1 Safety Safety Guidelines 2 Compliance 7 Safety and Conformity Labeling 8 ...
Страница 72: ...Chapter 3 Installation 62 SE505 Hardware Manual ...
Страница 168: ...Chapter 4 Replacing Components and Preventive Maintenance 158 SE505 Hardware Manual ...
Страница 180: ...Index 170 SE505 Hardware Manual ...