10. First start
When the heat pump is delivered, the compressor is blocked to avoid it
being unintentionally started. The heat pump can be installed and started
before the brine circuit is put into operation.
The heat pump can also be started without a fitted room sensor. The set
curve will then regulate the heating. The sensor can, however, always be
fitted for the alarm LED function.
Before first start
1.
Check that the heating boiler and system are full of water and have
been bled.
2.
Ensure that the brine system is filled with water and antifreeze and that
it is bled or ensure that the compressor is blocked.
3.
Check that all connections are tight.
4.
Check that all sensors are connected to the electrical supply.
5.
Check that the connections behind the insulation caps are secure.
Remove both insulation caps by pulling carefully on the points marked.
6.
The backup heating thermostat is OFF as its factory setting.
Recommended mode is
= Frost protection setting, approx. +7 °C.
The backup heating thermostat is in the electrical switchboard behind
the front panel. It is in the OFF position when it is turned anticlockwise
as far as it will go (the screwdriver slot should be vertical).
At the end of the installation, check the connections of any current
sensors. In this situation it is important that you have switched off
any major consumers of electricity in the house. Also make sure that
the backup thermostat is turned off.
NB: The product has an automatic bleeding sequence for the DHW
system, which runs in the background. The sequence takes approx.
15 minutes and does not affect other functions.
Check connections.
Symbol for backup heating
thermostat:
Содержание GSi 600 Series
Страница 26: ...26 CTC GSi 600 CTC GSi 616 CTC GSi 608 GSi 612 qw l min qw l min 6 1 8 Pressure differential diagram hot side ...
Страница 31: ...31 CTC GSi 600 Y60 B2 G2 Y2 G2 B15 B11 6 1 15 Schematic diagram passive cooling alt 1 common cooling heating ...
Страница 33: ...33 CTC GSi 600 B15 B12 B11 B2 G2 G2 Y2 6 1 17 Schematic diagram passive cooling alt 3 ...
Страница 64: ...8 22 HP cooling module schematic diagram 3x400V A5 ...
Страница 65: ...8 23 HP cooling module schematic diagram 1x230V 3x230V A5 ...
Страница 67: ...M GF B25 B26 Y21 B5 G20 B24 B23 B27 B28 G11 G5 B102 B18 ...
Страница 131: ...131 CTC GSi 600 ...
Страница 132: ......
Страница 133: ......
Страница 134: ......
Страница 135: ......
Страница 136: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 505 58 1 2020 09 16 ...