![CTC Union GSi 600 Series Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ctc-union/gsi-600-series/gsi-600-series_installation-and-maintenance-manual_2693362020.webp)
20
CTC GSi 600
4. Important to remember!
Check the following points at the time of delivery and installation:
4.1
Transportation
Transport the unit to the installation site before removing the packaging.
Handle the product in the following manner:
• Forklift.
• Lifting eye that has been fitted to the lifting sleeve on top of the product
in the expansion connection.
• Lifting band around the pallet.
NB:
Can only be used with the
packaging on.
Remember that the product has a high centre of gravity and should be
handled with caution.
• The product must be transported and stored in an upright position.
4.2
Positioning
• Remove the packaging and check before installation that the product
has not been damaged in transit. Report any transport damage to the
carrier.
• Place the product on a solid foundation, preferably made of concrete.
If the product needs to be placed on a soft carpet, base plates
must be placed under the adjustable feet.
• Avoid placing the heat pump in rooms where the walls are of
lightweight design, as people in the adjoining room may be disturbed
by the compressor and vibrations.
• Remember to leave a service area of at least 1 metre in front of the
product.
• The product must not be placed below floor level either.
4.3
Recycling
• The packaging must be deposited at a recycling station or with the
installation engineer for correct waste management.
• Obsolete products must be disposed of correctly and transported to a
waste station or distributor/retailer offering this service.
Disposal of the product as household waste is not permitted.
• It is very important that the product’s refrigerant, compressor oil and
electric/electronic components are disposed of correctly.
4.4
After commissioning
• The installation engineer advises the property owner on the design and
servicing of the system.
• The installation engineer fills in a checklist and contact information –
the customer and installation engineer sign the list, which the customer
keeps.
• Register the product for warranty and insurance via the website
https://ctc.se/kundservice#garantiregistrering
https://www.ctc-heating.com/customer-service#warranty-registration
Содержание GSi 600 Series
Страница 26: ...26 CTC GSi 600 CTC GSi 616 CTC GSi 608 GSi 612 qw l min qw l min 6 1 8 Pressure differential diagram hot side ...
Страница 31: ...31 CTC GSi 600 Y60 B2 G2 Y2 G2 B15 B11 6 1 15 Schematic diagram passive cooling alt 1 common cooling heating ...
Страница 33: ...33 CTC GSi 600 B15 B12 B11 B2 G2 G2 Y2 6 1 17 Schematic diagram passive cooling alt 3 ...
Страница 64: ...8 22 HP cooling module schematic diagram 3x400V A5 ...
Страница 65: ...8 23 HP cooling module schematic diagram 1x230V 3x230V A5 ...
Страница 67: ...M GF B25 B26 Y21 B5 G20 B24 B23 B27 B28 G11 G5 B102 B18 ...
Страница 131: ...131 CTC GSi 600 ...
Страница 132: ......
Страница 133: ......
Страница 134: ......
Страница 135: ......
Страница 136: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 505 58 1 2020 09 16 ...