![CTC Union GSi 600 Series Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/ctc-union/gsi-600-series/gsi-600-series_installation-and-maintenance-manual_2693362041.webp)
41
CTC GSi 600
104
102
103
98d
100
101
99
97
96
98c
98a
98b
97
96
97
98
99
100
101
102
103
104r
7.2
Brine system schematic diagram
!
The mixing vessel
and pump must be
of a good size.
Level/expansion vessel
Filler manifold
Shut-off valves
Filter
External fi lling pump
Mixing vessel
Brine pump
Evaporator
Safety valve 3 bar
The diagram shows the main connection for the brine system. The fi lling
equipment is represented by the parts displayed with dashes. NB: Collector
hoses must have a bleeding facility as air pockets can occur. Always check
the fi lter (99) when fi lling and bleeding the brine system.
7.2.1
Post-installation check on brine system
After a few days, you must check the fl uid level in the vessel. Fill if necessary
and close the valve (98c) when fi lling.
7.2.2
Level/expansion vessel (96)
The level vessel should be fi tted to the incoming line from the borehole or
ground loop, at the system’s highest point. Bear in mind that the tank can
produce condensate on its exterior. Fit the safety valve (104) as shown in the
schematic diagram and fi t a suitable plug to the top of the vessel.
If the vessel cannot be fi tted at the highest point, a closed expansion vessel
can be fi tted.
7.2.3
Filler manifold with dirt fi lter
A fi ller manifold for topping up, adding and fi ltering brine. Arrows on the valve
housing indicate the fl ow direction. Close valves (98c) when cleaning the
fi lter. Unscrew the fi lter cap and fl ush the fi lter clean. When refi tting, the pin
under the fi lter should be fed into the designated hole in the fi lter housing.
Top up with a little brine, if necessary, before fi tting the cap. The fi lter should
be checked and cleaned after a short period of operation.
Содержание GSi 600 Series
Страница 26: ...26 CTC GSi 600 CTC GSi 616 CTC GSi 608 GSi 612 qw l min qw l min 6 1 8 Pressure differential diagram hot side ...
Страница 31: ...31 CTC GSi 600 Y60 B2 G2 Y2 G2 B15 B11 6 1 15 Schematic diagram passive cooling alt 1 common cooling heating ...
Страница 33: ...33 CTC GSi 600 B15 B12 B11 B2 G2 G2 Y2 6 1 17 Schematic diagram passive cooling alt 3 ...
Страница 64: ...8 22 HP cooling module schematic diagram 3x400V A5 ...
Страница 65: ...8 23 HP cooling module schematic diagram 1x230V 3x230V A5 ...
Страница 67: ...M GF B25 B26 Y21 B5 G20 B24 B23 B27 B28 G11 G5 B102 B18 ...
Страница 131: ...131 CTC GSi 600 ...
Страница 132: ......
Страница 133: ......
Страница 134: ......
Страница 135: ......
Страница 136: ...Enertech AB P O Box 309 SE 341 26 Ljungby Sweden www ctc se www ctc heating com 162 505 58 1 2020 09 16 ...