4
TABLE OF CONTENTS
I.
Product Description, Specifications and Dimensional Data......................
5
II.
Unpacking Boiler........................................................................................ 8
III. Pre-Installation and Boiler Mounting ........................................................
9
IV. Venting...................................................................................................... 14
A. General Guidelines............................................................................... 14
B. CPVC/PVC Venting.............................................................................. 19
C. Polypropylene Venting......................................................................... 25
D. Stainless Steel Venting........................................................................ 28
E. Removing the Existing Boiler...............................................................
31
F. Multiple Boiler Installation Venting....................................................... 32
V.
Condensate Disposal................................................................................. 34
VI. Water Piping and Trim............................................................................... 36
VII. Gas Piping ............................................................................................... 46
VIII. Electrical ................................................................................................... 50
IX. System Start-up ....................................................................................... 62
X. Operation...................................................................................................... 70
A. Overview............................................................................................... 70
B. Supply Water Temperature Regulation................................................ 71
C. Boiler Protection Features.................................................................... 72
D. Multiple Boiler Control Sequencer........................................................ 73
E. Boiler Sequence of Operation.............................................................. 74
1. Normal Operation........................................................................... 74
2. Using The Display..........................................................................
75
F. Viewing Boiler Status............................................................................ 76
1. Status Screens.............................................................................. 76
2. Detail Screens............................................................................... 78
3. Multiple Boiler Sequencer Screens................................................ 79
G. Changing Adjustable Parameters........................................................
80
1. Entering Adjust Mode.................................................................... 80
2. Adjusting Parameters..................................................................... 80
XI. Service and Maintenance ........................................................................ 98
XII.
Troubleshooting........................................................................................
104
XIII. Repair Parts ............................................................................................. 109
Содержание Phantom-X PHNTM210
Страница 7: ...7 Figure 1B Model PHNTM285 I Product Description Specifications and Dimensional Data continued...
Страница 52: ...52 VIII Electrical continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Wiring Connections Diagram...
Страница 54: ...54 VIII Electrical continued Figure 27 Ladder Diagram...
Страница 59: ...59 Figure 29B Boiler to Boiler Communication with Crown Zone Panel PN 3501505 VIII Electrical continued...
Страница 109: ...109 XIII Repair Parts 1L 1K 1J 1E 1C 1D 1B 1L 1J 1A 1M 1F 1C 1D 1B 1L 1J 1A 1M 1F 1K 1G 1G 1K 1H 1G...
Страница 118: ...118...
Страница 119: ...119...