17
3. Vent/Combustion Air Terminals
Install venting system components on exterior
of building only as specifically required by these
instructions (refer to Figure 4).
a. Use only listed vent/combustion air terminals.
i.
Horizontal Sidewall Venting: Use tee
terminals for both vent and combustion air
as shown in Figure 5. Alternate snorkel
terminations are shown in Figure 6A and
Figure 6B.
ii.
Vertical Roof Venting: Use straight
coupling on vent and two 90° elbows turned
downwards for combustion air as shown in
Figure 7 and Figure 8.
IV. Venting
A. General Guidelines (continued)
Table 6B: Vent/Combustion Air Equivalent Length Calculation Work Sheet
Combustion Air
Vent
90° Elbow(s) (Installer Supplied)
90° Elbow(s) (CPVC Supplied with Boiler)
Nominal Diameter
Quantity
(Pc)
Equivalent
Length, per Pc
Subtotal,
Equivalent
Length (A)
Nominal Diameter Quantity
(Pc)
Equivalent Length,
per Pc
Subtotal,
Equivalent
Length (D)
3 in.
(80 mm)
10 ft. (3.0 m)
3 in.
(80 mm)
1
10 ft. (3.0 m)
10 ft. (3.0 m)
4 in.
(100 mm or 110 mm)
13 ft. (4.0 m)
4 in.
(100 mm or 110 mm)
1
13 ft. (4.0 m)
13 ft. (4.0 m)
45° Elbow(s) (Installer Supplied)
90° Elbow(s) (Installer Supplied)
Nominal Diameter
Quantity
(Pc)
Equivalent
Length, per Pc
Subtotal,
Equivalent
Length (B)
Nominal Diameter
Quantity
(Pc)
Equivalent Length,
per Pc
Subtotal,
Equivalent
Length (A)
3 in.
(80 mm)
3.0 ft. (.09 m)
3 in.
(80 mm)
10 ft. (3.0 m)
4 in.
(100 mm or 110 mm)
4.5 ft. (1.4 m)
4 in.
(100 mm or 110 mm)
13 ft. (4.0 m)
Straight Pipe, (Installer Supplied)
45° Elbow(s) (Installer Supplied)
Nominal Diameter
Quantity
Length,
ft or m
Equivalent
Length,
ft/ft or m/m
Subtotal,
Equivalent
Length (C)
Nominal Diameter
Quantity
Length,
ft or m
Equivalent Length,
ft/ft or m/m
Subtotal,
Equivalent
Length (B)
3 in.
(80 mm)
1
3 in.
(80 mm)
3.0 ft. (.09 m)
4 in.
(100 mm or 110 mm)
1
4 in.
(100 mm or 110 mm)
4.5 ft. (1.4 m)
* Total Equivalent Length (A+B+C) =
2.5 Ft. (760 mm) Straight Pipe, (CPVC Supplied with Boiler)
*
Notes:
1. Calculated total equivalent length cannot exceed
maximum equivalent length shown in Table 5.
2. Vent and combustion air terminals do not count towards
total equivalent length.
3. Pressure drop for flexible polypropylene liner is 20%
greater than for rigid pipe. Multiply measured flexible
polypropylene liner length by 1.2 to obtain equivalent
length.
Example
Measure length of flexible polypropylene liner = 35 ft.
Equivalent length of flexible polypropylene liner = 35 ft.
x 1.2 = 42 ft.
4. Maximum equivalent length of flexible polypropylene liner
is 48 ft. (14.6 m).
5. All elbows referenced are short radius.
Nominal Diameter
Quantity
Length,
ft or m
Equivalent Length,
ft/ft or m/m
Subtotal,
Equivalent
Length (E)
3 in.
(80 mm)
2.5 ft.
(0.76 m)
1
2.5 ft.
(0.76 m)
4 in.
(100 mm or 110 mm)
2.5 ft.
(0.76 m)
1
2.5 ft.
(0.76 m)
Straight Pipe, (Installer Supplied)
Nominal Diameter
Quantity
Length,
ft
Equivalent Length,
ft/ft
Subtotal,
Equivalent
Length (C)
3 in.
(80 mm)
1
4 in.
(100 mm or 110 mm)
1
* Total Equivalent Length (A+B+C+D+E) =
Figure 5: Direct Vent - Sidewall Tee Terminations
Содержание Phantom-X PHNTM210
Страница 7: ...7 Figure 1B Model PHNTM285 I Product Description Specifications and Dimensional Data continued...
Страница 52: ...52 VIII Electrical continued...
Страница 53: ...53 VIII Electrical continued Figure 26 Wiring Connections Diagram...
Страница 54: ...54 VIII Electrical continued Figure 27 Ladder Diagram...
Страница 59: ...59 Figure 29B Boiler to Boiler Communication with Crown Zone Panel PN 3501505 VIII Electrical continued...
Страница 109: ...109 XIII Repair Parts 1L 1K 1J 1E 1C 1D 1B 1L 1J 1A 1M 1F 1C 1D 1B 1L 1J 1A 1M 1F 1K 1G 1G 1K 1H 1G...
Страница 118: ...118...
Страница 119: ...119...