background image

6    

                                                                                                                                

Figure 1A: Model PHNTM210

I.  Product Description, Specifications and Dimensional Data 

(continued)

'F

' G

A

S

 V

A

LV

E

 IN

LE

T

3

4

" F

P

R

E

LI

E

F/

D

R

A

IN

TA

P

P

IN

G

'H

' S

U

P

P

LY

 T

AP

PI

N

G

'G

' R

E

TU

R

N

 T

AP

PI

N

G

'J

' C

O

N

D

E

N

S

A

TE

TR

A

P

 D

R

A

IN

LO

W

 V

O

LT

A

G

E

K

N

O

C

K

O

U

TS

(2

VO

LT

S)

LI

N

E

 V

O

LT

AG

E

K

N

O

C

K

O

U

TS

(1

15

 V

O

LT

S)

3X

P

V

C

/C

P

V

C

V

E

N

A

D

A

P

TE

R

Содержание Phantom-X PHNTM210

Страница 1: ...ons carefully before installing Series High Efficiency Gas Fired Hot Water Direct Vent Condensing Boilers INSTALLATION AND OPERATING INSTRUCTIONS These instructions must be affixed on or adjacent to t...

Страница 2: ...te http license reg state ma us pubLic pl_products pb_pre_form asp for the latest Approval Code or ask your local Sales Representative The Commonwealth of Massachusetts requires this product to be ins...

Страница 3: ...l be permanently mounted to the exterior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating...

Страница 4: ...Piping and Trim 36 VII Gas Piping 46 VIII Electrical 50 IX System Start up 62 X Operation 70 A Overview 70 B Supply Water Temperature Regulation 71 C Boiler Protection Features 72 D Multiple Boiler C...

Страница 5: ...g in B example PHNTM285HNT1SUB Dimension Boiler Model PHNTM210 PHNTM285 A Inch mm 23 15 16 608 21 13 16 554 B Inch mm 5 13 16 147 7 5 16 185 C Inch mm 7 5 16 186 14 1 8 358 D Inch mm 17 1 8 435 18 456...

Страница 6: ...ion Specifications and Dimensional Data continued F GAS VALVE INLET 3 4 FPT RELIEF DRAIN TAPPING H SUPPLY TAPPING G RETURN TAPPING J CONDENSATE TRAP DRAIN LOW VOLTAGE KNOCKOUTS 24 VOLTS LINE VOLTAGE K...

Страница 7: ...7 Figure 1B Model PHNTM285 I Product Description Specifications and Dimensional Data continued...

Страница 8: ...s above 7000ft 1 Net AHRI Water Ratings based on piping and pickup allowance of 1 15 The manufacturer should be consulted before selecting a boiler for installations having unusual piping and pickup r...

Страница 9: ...nce Refer to Figure 2 for minimum listed clearances from combustible material Recommended III Pre Installation and Boiler Mounting service clearance is 24 in 610 mm from left side front top and rear o...

Страница 10: ...pump if required Boiler Clearances to Combustible and Non Combustible Material All models are listed for closet installation with the following minimum clearances Top 1 in 25 mm Front 1 in 25 mm Left...

Страница 11: ...ypropylene Vent or Flexible Polypropylene Liner for Vertical Venting only and Rigid Polypropylene or PVC Combustion Air Intake Pipe Rigid Polypropylene Vent or Flexible Polypropylene Liner for Vertica...

Страница 12: ...l at the panel lower left corner and align bracket two upper holes with corresponding side panel lower dimples The remaining lower bracket hole must align with a matching bottom boiler left side panel...

Страница 13: ...common gas piping is sized insure it will have adequate capacity for combined input CFH gas flow of the selected stackable boiler combination c Water Piping and Trim Follow instructions in Section VI...

Страница 14: ...include vent combustion air terminals in equivalent feet calculations Use vent combustion air equivalent length worksheet provided in Table 6B b Maintain minimum clearance to combustible materials Se...

Страница 15: ...6A 6B 9 12 14 10A 10B Optional Vertical Vertical through roof or chimney chase The system includes separate Flexible Polypropylene vent liner and Rigid Polypropylene vent pipe combination for venting...

Страница 16: ...densate may pool Do not penetrate any part of the vent system with fasteners Les instructions d installation du syst me d vacuation doivent pr ciser que les sections horizontales doivent tre support e...

Страница 17: ...4 5 ft 1 4 m 4 in 100 mm or 110 mm 13 ft 4 0 m Straight Pipe Installer Supplied 45 Elbow s Installer Supplied Nominal Diameter Quantity Length ft or m Equivalent Length ft ft or m m Subtotal Equivale...

Страница 18: ...r doors f Locate bottom of vent terminal at least 3 ft 900 mm above any forced air inlet located within 10 ft 3 0 m g If window and or air inlet is within 4 ft 1 2 m of an inside corner maintain at le...

Страница 19: ...s within any interior space where air cannot circulate freely including through vertical or horizontal chase ways inside a stud wall in closets and through wall penetrations The use of cellular core P...

Страница 20: ...nd Sensor Cap 105133 02 1 N A 4 Vent 4 Combustion Air CPVC PVC Connector with Flue Temperature Sensor and Sensor Cap 105133 03 N A 1 3 Vent 3 Combustion Air CPVC PVC Connector Gasket 230841 N A N A 4...

Страница 21: ...al run 1 N A 4 in Schedule 40 PVC Pipe x ft min horizontal run 1 2 Table 7B CPVC PVC Vent Air Intake Components Installer Provided Required for Optional Horizontal Snorkel Termination IV Venting B CPV...

Страница 22: ...t to accommodate desired vent configuration provided both pieces are used in conjunction with CPVC 90 Elbow before any PVC components are used Ensure that the CPVC 90 Elbow is the first elbow used in...

Страница 23: ...close PVC venting Use higher temperature rated CPVC pipe in enclosed spaces or to penetrate combustible or non combustible walls PVC vent pipe may not be used to penetrate combustible or non combustib...

Страница 24: ...e See Figure 6A At top of vent pipe length install another PVC 90 elbow so that elbow leg is opposite the building s exterior surface Install rodent screen and vent terminal supplied with boiler see F...

Страница 25: ...e Figure 13 for appropriate configuration Brace exterior piping if required C Polypropylene Venting WARNING Asphyxiation Hazard Follow these instructions and the installation instructions included by...

Страница 26: ...olypropylene Pipe Fittings and Terminations M G DuraVent Boiler Model Centrotherm Eco Part Numbers Sizes Boiler Adapter PVC to PP Boiler Adapter Connector Rigid Pipe Flex Pipe Pipe Joint Locking Band...

Страница 27: ...85 are listed for vertical venting by installing flexible vent in an UNUSED masonry chimney chase and supplying combustion air through a separate wall or roof combustion air terminal b Refer to Figure...

Страница 28: ...nd these instructions the more restrictive instructions shall govern Do not mix vent components from listed manufacturers Examine all components for possible shipping damage prior to installation All...

Страница 29: ...ns When pipe is cut cut end must be square and carefully de burred prior to assembly IV Venting D Stainless Steel Venting continued a Plan venting system to avoid possible contact with plumbing or ele...

Страница 30: ...ow leg is opposite the building s exterior surface Install rodent screen not supplied and horizontal vent terminal Brace exterior piping if required 5 Vertical Vent Termination a Standard Two Pipe Ter...

Страница 31: ...appliances remaining connected to the common venting system are not in operation 1 Seal any unused openings in the common venting system 2 Visually inspect the venting system for proper size and horiz...

Страница 32: ...r Installation Venting 1 Vent Piping and Terminations a Multiple boiler vent terminations are shown in Figure 18 b Each individual boiler must have its own vent pipe and vent terminal Refer to Paragra...

Страница 33: ...V Venting F Multiple Boiler Installation Venting continued Figure 17 Flexible Stainless Steel Vent in Masonry Chimney with Separate Combustion Air Intake Figure 18 Multiple Boiler Direct Vent Terminat...

Страница 34: ...to the boiler to insure combustion products cannot escape from operating boiler To fill the trap inject water in the amount of 1 cup 240ml through condensate trap connection Do not overfill the trap...

Страница 35: ...11C Maximum Condensate Flow Boiler Model Maximum Condensate Flow GPH PHNTM210 2 4 PHNTM285 3 2 Assumes 100 of water in fuel condenses V Condensate Disposal continued Figure 19 Condensate Trap and Dra...

Страница 36: ...ront in tapping making sure tee run outlets are in vertical plane and parallel to boiler side c Mount in MPT x in FPT Pressure Relief Valve into the tee top outlet d Install Drain Valve into the tee b...

Страница 37: ...late boiler from system piping via closely spaced tees to insure specified flow range through boiler any time the boiler is firing a The flow rate through the boiler loop is maintained by factory supp...

Страница 38: ...Boiler VI Water Piping and Trim B Piping System To Be Employed continued Table 13 Recommended Circulators for 50 ft Equivalent ft Near Boiler Piping Approximately 20 ft Straight Pipe 4 90 Elbows and 2...

Страница 39: ...port 4 3 7 0 6 6 14 0 Ball Valve full port 1 9 1 4 2 2 1 3 Swing Check Valve 4 5 5 5 6 5 9 0 Flow Check Valve typical 54 0 74 0 57 0 177 0 Butterfly Valve 2 7 2 0 2 7 4 5 Threaded Fitting and Valve E...

Страница 40: ...d Installation Requirements continued CAUTION It is the installers responsibility to select pumps and boiler piping configurations that provide the proper flow rates and performance for the boiler and...

Страница 41: ...m C Standard Installation Requirements continued CAUTION It is the installers responsibility to select pumps and boiler piping configurations that provide the proper flow rates and performance for the...

Страница 42: ...1 Systems containing high level of dissolved oxygen Many hydronic systems contain enough dissolved oxygen to cause severe corrosion damage to Phantom boiler heat exchanger Some examples include but no...

Страница 43: ...er Installation continued Figure 23A Multiple Boiler Water Piping w Domestic Hot Water Heater Page 1 of 2 NOTICE Installing a low water cutoff in the system piping of multiple boilers is strongly reco...

Страница 44: ...w Domestic Hot Water Heater Page 2 of 2 VI Water Piping and Trim E Multiple Boiler Installation continued NOTICE Installing a low water cutoff in the system piping of multiple boilers is strongly reco...

Страница 45: ...r refill is not recommended however if such refill is employed a water meter must be added to evaluate the makeup water volume taken after ini tial fill and eliminate any water leakage as early as pos...

Страница 46: ...SI or less 0 5 Inch W C Pressure Drop Nominal Pipe Size In Inside Diameter In Length of Pipe Ft 10 20 30 40 50 60 70 80 90 100 0 622 172 118 95 81 72 65 60 56 52 50 0 824 360 247 199 170 151 137 126 1...

Страница 47: ...252 215 191 173 159 148 139 131 1 1 380 937 644 517 442 392 355 327 304 285 269 1 1 610 1403 964 775 663 588 532 490 456 427 404 2 2 067 2703 1858 1492 1277 1131 1025 943 877 823 778 2 2 469 4308 2961...

Страница 48: ...ce of such requirements follow National Fuel Gas Code ANSI Z223 1 NFPA 54 and or Natural Gas and Propane Installation Code CAN CSA B149 1 2 Use thread joint compounds pipe dope resistant to action of...

Страница 49: ...t the smallest individual module boiler CAUTION If gas pressure in the building is above psig 3 4 kPa an additional gas pressure regulator is required Using one additional regulator for multiple boile...

Страница 50: ...BTU hr or greater This boiler is equipped with a tankless coil DANGER Electrical Shock Hazard Positively assure all electrical connections are unpowered before attempting installation or service of e...

Страница 51: ...ower lines and fluorescent lighting Wire the sensor to the boiler using 22 gauge or larger wire As with the sensor the sensor VIII Electrical continued wiring should be routed away from sources of ele...

Страница 52: ...52 VIII Electrical continued...

Страница 53: ...53 VIII Electrical continued Figure 26 Wiring Connections Diagram...

Страница 54: ...54 VIII Electrical continued Figure 27 Ladder Diagram...

Страница 55: ...re 28A Modified Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header Heating with Central Heating Circulators Plus Alternately Piped Indirect Water Heater VIII Electrical con...

Страница 56: ...re 28B Modified Wiring For DHW Priority When Using Low Flow Circulator Piped Off System Header Heating with Central Heating Zone Valves Plus Alternately Piped Indirect Water Heater VIII Electrical con...

Страница 57: ...57 Figure 28C DHW Priority Circulators with Crown PN 3501505 Zone Panel Piped Off System Header Wiring Schematic for Heating Zone Circulators CROWN PN 3501505 VIII Electrical continued...

Страница 58: ...58 Figure 29A Multiple Boiler Wiring Diagram Internal R7910 Multiple Boiler Control Sequencer Three Boilers Shown Typical Connections for up to Eight Boilers VIII Electrical continued...

Страница 59: ...59 Figure 29B Boiler to Boiler Communication with Crown Zone Panel PN 3501505 VIII Electrical continued...

Страница 60: ...Figure 23A for installation location and Figure 30 for installation detail b Ethernet Cables Ethernet cables are used to connect the boiler network together These are standard straight through cables...

Страница 61: ...Addresses Assign all boilers a unique Boiler Address using any number from 1 through 8 WARNING When two boiler s addresses are the same undesirable simultaneous operation occurs 5 Enable 1 Boiler Mas...

Страница 62: ...on 1 Obtain gas heating value in Btu per cubic foot from gas supplier 2 Phantom gas valves have inlet and outlet pressure taps with built in shut off screw Turn each screw from fully closed position t...

Страница 63: ...63 IX System Start up continued Figure 32 Operating Instructions Phantom Series Lighting and Operating Instructions...

Страница 64: ...on analyzer Failure to use combustion analyzer could result in property damage personal injury or loss of life 1 Remove flue temperature sensor from vent connector see Figure 9 and insert combustion a...

Страница 65: ...e sensor and sensor cap into two pipe vent connector port upon completion of combustion test Failure to properly secure the flue temperature sensor into the port could lead to property damage personal...

Страница 66: ...performed by a qualified service agency in accordance with the manufacturer s instructions and all applicable codes and requirements of the authority having jurisdiction If the information in these i...

Страница 67: ...us area on the gas valve c Apply the Boiler Conversion Label to a conspicuous surface on or adjacent to the outer boiler jacket Fill in the date of the conversion and the name and address of the compa...

Страница 68: ...ss of life Under these conditions most combustion analyzers used in the field will show 0 O2 and a very high well over 1000 ppm CO Combustion readings will also appear to be unresponsive to throttle a...

Страница 69: ...efer to Paragraph G Adjusting Parameters Pump Setup Menu for additional information Boiler Pump Domestic Pump 5 Contractor Setup Contractor Name Enter your contact information name address and phone n...

Страница 70: ...Control The Control includes safety controls designed to ensure safe and reliable operation In addition to flame safety controls the Control includes supply water temperature differential water temper...

Страница 71: ...door temperature sensor is connected to the boiler and Outdoor Reset is enabled the Central Heat and Auxiliary Heat setpoints will automatically adjusted downwards as the outdoor temperature increases...

Страница 72: ...an be installed between terminals 11 and 12 on the low voltage terminal strip Be sure to remove the jumper when adding an external limit control to the system If the external limit opens the boiler wi...

Страница 73: ...equenceMasterrespondstoCentralHeat Auxiliary Heat DHW and frost protection demands similar to the standaloneboiler Forexample whenselectedandDHW priorityisactive thesequencemasterusesDHWsetpoint Diff...

Страница 74: ...Heat Status Running burner On circulator s On After flame is proven the sequence continues with run stabilization and low fire hold time Once the field adjustable low fire hold time is completed norm...

Страница 75: ...e Fault and Rate Limit symbols provide a link to the cause of a boiler fault or firing rate limit The first boiler status screen provides an overview of boiler operation including fault status Rate Fi...

Страница 76: ...protec tion logic the 6 symbol blinks and becomes a screen link Rate The rate value is equal to the actual kbtu hr input divided by the boiler rated input Priority The selected Priority is shown Avai...

Страница 77: ...s can be an indication of gas supply issues Additionally supply and return tempera ture dual pen trends brings a focused look at heat exchanger and pump performance For example studying a differential...

Страница 78: ...re Press the zone control button to view individual zone Zone Panel 1 typical for 2 through 4 Zone panel screens show individual zone status cycle counts and individual zone heat loss size in kbtu hr...

Страница 79: ...d last to stop The lead boiler is automatically rotated after 24 hours of run time Additionally the lead is rotated if there is a lead boiler fault Firing Rate Demanded firing rate is provided The Seq...

Страница 80: ...Home screen Press the Adjust button on the Adjust Mode screen or Press Service Contact for service provider contact information Press Login button to access password screen Press 5 digit display to o...

Страница 81: ...surement matching the refer ence reading Not Connected Connected Not Connected Zone Control Status Connected When the Zone Control is connected adjustable settings are automatically shown under the Ad...

Страница 82: ...aximum blower speeds Incorrect boiler type can cause hazardous burner conditions and improper operation that may result in PROPERTY LOSS PHYSICAL INJURY OR DEATH Table 29 Parameters Changed Using the...

Страница 83: ...he expected heat rate value to set a maximum heat rate The maximum heat rate is the highest heat rate that the boiler can fire to at that moment The maximum heat rate is the summation of the expected...

Страница 84: ...ted Heat Rate This parameter defines the highest modulation rate the Control will go to during the auxiliary heat call for heat If the rated input of the Auxiliary Heat Zones is less than the maximum...

Страница 85: ...l for heat Central Heat off DHW demand Make sure indirect water heater and DHW circulator are sized to maintain flow through boiler within limits shown in Table 12 Pump Runs during central heat and fr...

Страница 86: ...tem pump X DHW pump X Boiler Pump X X Sequencer Master Parameter Selections Sequencer Master Enabled Indirect Water Heater Boiler Piped Pump Parameter Selections System Pump Central Heat No Priority N...

Страница 87: ...l It is permissible for the domestic and system pumps to run at the same time The boiler pump must run for every call for heat X Operation F Changing Adjustable Parameters continued Example Pump Param...

Страница 88: ...thout Saving Clear Entire Field Backspace Save Field and Exit Save Press box to input contractor information Contractor Name i Bill Smith 1 7 6 5 4 3 2 A ES C D C B 8 CL R 7 BS 8 Enter Contractor Info...

Страница 89: ...erature drops Diff Below degrees below the setpoint 3 1 to 5 Response Speed This parameter adjusts the Central Heat temperature controller Proportion Integral Derivative PID values Higher values cause...

Страница 90: ...alue increases to high fire causing the temperature to exceed the Diff Above setpoint and cycle the boiler unnecessarily Lower values cause a smaller firing rate change for each degree of temperature...

Страница 91: ...ange for each degree of temperature change If set too low the firing rate response will be sluggish and temperature will wander away from setpoint 10 seconds 0 to 300 seconds Low Fire Hold Time Low Fi...

Страница 92: ...s typically set to the coldest outdoor temperature 70 F 21 1 C 32 F to 100 F 0 C to 37 8 C Central Heat High Outdoor Temperature The High Outdoor Temperature parameter is the outdoor temperature at wh...

Страница 93: ...iary Heat Low Outdoor Temperature The Low Outdoor Temperature parameter is also called Outdoor Design Temperature This parameter is the outdoor temperature used in the heat loss calculation It is typi...

Страница 94: ...entral Heat Setpoint Heating Element Type 180 F to 190 F 82 2 C to 87 8 C Fan Coil 100 F to 140 F 37 8 C to 60 C In Slab Radiant High Mass Radiant 160 F to 190 F 71 1 C to 87 8 C Convection Baseboard...

Страница 95: ...ped below the setpoint minus Diff be low setpoint Longer time delay will prevent nuisance starts due to short temperature swings 195 F 90 6 C Central Heat Setpoint 195 F 90 6 C Stop All Boilers Setpoi...

Страница 96: ...iption Central Heat 1 User defined Zone Control 1 Zone 1 Central Heat 2 User defined Zone Control 1 Zone 2 Central Heat 3 User defined Zone Control 1 Zone 3 Central Heat 4 User defined Zone Control 1...

Страница 97: ...eters may be used to adjust the signal range Modbus Modbus is used as the temperature setpoint 130 F 54 4 C 80 F 26 7 C Central Heat Setpoint Central Heat 4 20mAdc Setup 4 mA Water Temperature Sets th...

Страница 98: ...respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clo...

Страница 99: ...iate safeguards and alarms should be installed on the heating system to prevent damage if the boiler is inoperative Burn Hazard This boiler contains very hot water under high pressure Do not unscrew a...

Страница 100: ...e the following should be performed by a service technician once every year 1 Follow the procedure for turning the boiler off per Figure 32 Operating Instructions 2 Inspect the wiring to verify the co...

Страница 101: ...Products 1 System Cleaning and Conditioning a The following heating system water treatment products are recommended for an initial existing heating system sludge removal initial boiler cleaning from c...

Страница 102: ...roftheglycolsolution Allowance shouldbemadeforexpansionoftheglycolsolution WARNING Poison Hazard Use only inhibited propylene glycol solutions specifically formulated for hydronic systems Do not use e...

Страница 103: ...re above j Insure that fresh silicon sealant is applied to the overflow switch threads and the switch is properly orientedrelativetothetrapbody thearrowmolded into the switch hex side end must face do...

Страница 104: ...ve Control ER0011 Adjustment Mode Password Timeout The Control and Display are NOT defective The password has timed out Simply cycle power to the Display to restore operation ER0012 Control Failed Def...

Страница 105: ...bled Master s Boiler has been powered down To clear fault restore communication or cycle power Boiler Size Setup Boiler Size Fault WARNING Boiler size setting may not match actual boiler size The Boil...

Страница 106: ...uced to help avoid a lockout or save energy Refer to Hard Lockout section for corrective actions High Stack Temperature Limit High Supply Temperature Limit High Differential Temperature Limit The foll...

Страница 107: ...nal Limit defective or jumper not installed If yellow light on LWCO is on system is low on water If neither yellow or green light is on check LWCO harness 7 Return sensor fault Shorted or open return...

Страница 108: ...nlet pressure is below maximum on rating plate before replacing valve 18 Light off rate proving failed Blower is not running at Light off rate when it should or blower speed signal not being detected...

Страница 109: ...109 XIII Repair Parts 1L 1K 1J 1E 1C 1D 1B 1L 1J 1A 1M 1F 1C 1D 1B 1L 1J 1A 1M 1F 1K 1G 1G 1K 1H 1G...

Страница 110: ...acement Burner Kit Not Shown includes burner head burner head seal and hardware 105188 04 105188 05 1G Burner Head 101731 04 101731 05 1H Burner Head Seal 102739 01 N A Replacement Burner Door Kit Not...

Страница 111: ...l Plate 2x M5 x 16 mm Phillips flat head screws Blower Adapter Plate Air Intake Adapter Blower Side Spacer Plate for size 080 through 150 only 101704 03 101704 04 2B 1 Blower Inlet Repair Kit Includes...

Страница 112: ...nt Condensate Float Switch Kit 105005 01 3C Spring Clip Condensate Trap 2 per boiler 101632 01 3D Rubber Grommet Condensate Trap 101595 01 3G Air Pressure Switch 104426 01 3H Air Pressure Switch Tubin...

Страница 113: ...Part Number 210 285 5A R7910 Kit 0 7000ft Altitude 106193 01 5A R7910 Kit 7000 10000ft Altitude 106193 02 106193 03 5B Programmed Display with Mounting Hardware 106217 01 5C Transformer 3502430 XIII...

Страница 114: ...05181 04 105181 05 6F High Voltage Terminal Bracket 102780 01 6G Replacement Front Door Kit includes labels 105532 02 105532 01 6H Control Tray 103336 01 6J Replacement Access Panel Kit 5 in x 8 in in...

Страница 115: ...4 Schedule 80 CPVC 90 Elbow 230814 N A 1 7G 3 x 3 CPVC PVC Vent System Connector Assembly with sensor cap and flue sensor 105133 01 N A 3 x 4 CPVC PVC Vent System Connector Assembly with sensor cap an...

Страница 116: ...50600 8C Safety Relief Valve 30 PSI 81660363 30 PSI 95 040 N A Alternate Safety Relief Valve Not Shown 50 PSI 103837 01 8D Boiler Drain Valve 3 4 NPT 95 041 8E Boiler Stacking Brackets Two 2 pcs per a...

Страница 117: ...B 10C 10D 102701 03 10A Main Low Voltage Harness 103009 03 10B High Voltage Harness 103010 02 10C Blower Power Harness 103012 01 10D Communication Harness 103011 01 10E Igniter Harness 105752 01 10F W...

Страница 118: ...118...

Страница 119: ...119...

Страница 120: ...120 CBC PN 980132 Rev D 7 15 Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134 www crownboiler com...

Отзывы: