
23
3.4 I-Test Manager Functional Overview
Refer to
for descriptions of the I-Test’s main features.
I-Test Manager can be used to configure I-Test to undertake any of these functional aspects.
This section provides an overview of the main features and functions of I-Test Manager, more details
can be found in the specific sections.
3.4.1 Manage Cylinders
Manage cylinders allows the user to setup and define cylinders of gas of predefined nominal values.
Each cylinder can be assigned unique name and stored to a database such that it can be assigned
to the inlet of an I-Test at a later date.
3.4.2
Inlet Configuration
Once a cylinder has been defined, Inlet Configuration will allow the cylinder to be assigned to a gas
inlet on I-Test. This assumes a specific cylinder of gas will then be physically connected to that inlet
and therefore allows the user to enter the actual concentration of gas, the lot number and the expiry
date of the cylinder.
3.4.3 Actions
This section allows the user to configure the operation or sequence of operations that will be undertaken
automatically when a gas monitor is inserted into the I-Test and the door closed. This sequence may
include (amongst others) speedy bump, smart bump, calibration and download of log files.
3.4.4
Field Configuration
During normal operation I-Test can be configured to change aspects of the gas monitor configuration,
this can occur as a stand alone activity or as part of a bump test or calibration. I-Test can change
gas monitor sensor alarm levels, logging interval and confidence strategy as well as other aspects of
configuration.
3.4.5 Reporting/Data Management
I-Test Manager offers the user a number of ways to manage the data collected by I-Test in normal
use. I-Test Manger can be used to view gas monitor log files uploaded during gas testing.
Bump test and calibration reports can then be generated as appropriate to the tests I-Test was
configured to undertake.
In addition, exception reporting can be utilised to allow the user to identify gas monitors that, for
example, have passed or failed a bump test or calibration in the last ‘x’ days, or are due calibration.
Contents
Exit
Unpacking
Set-up
Operating I-Test
I-Test
Manager
Configuring
I-Test
Warranty
Overview
Contacts
Appendices
Troubleshooting
Specification