72
CORN I NG ASCENT FBR PD SYSTEM
18. Place the bioreactor tray over the nest.
• Place the tray over the sterile connectors in the FBR nest.
• If using Lynx® connectors, check that they are still seated correctly in the brackets. If using
AseptiQuik® G connectors, check that the tubing is underneath the FBR nest to maximize
heat transfer.
19. Connect the temperature sensor.
Connect the FBR temperature sensor.
20. Unkink the tubing lines.
• Check that the bioreactor is sitting upright in the holder and is not tilted.
• Check for kinks in the tubing lines. Straighten out twists and kinks.
• The consumables are now set up.
• Return to the HMI for further instruction.
21. MFC and pumps turned off.
• A prompt will remind the user to complete setup, and to confirm that mass flow controllers
and pumps are turned off.
• Press
to confirm.
22. Zero Pressure Sensor.
Use the numbers on the images to perform the following steps:
1. Press the flashing green status box for the next prompt.
2. A prompt will remind the user to zero the pressure sensor.
3. Zero the sensor.
4. Press
when complete.
NOTE:
If pumps and mass flow controllers are not turned off, the pressure sensor zero button
will not appear.