Operation Manual
Track Supply 6 kW
80 / 125 A at 400 / 480 V
BAL9100-0124c-EN
www.conductix.com
Page 4 of 44
21
Tools ..................................................................................................................................................................................... 39
Adjustments during the commissioning and start-up .................................................................................................................. 40
Inspection report _____________________ ................................................................................................................................... 41
Inspection report _____________________ ................................................................................................................................... 42
Inspection report _____________________ ................................................................................................................................... 43
Important:
Company names mentioned in this manual that are registered and protected trade names by copyright do remain the
property of the companies themselves.
We reserve the right to carry out technical modifications of illustrations and statements in these operating instructions, in
order to improve the energy supply system and its function.
System related details please find in the system manuals. Refer always to the system documentation before starting any
work on the system or components within the system or before operating the system.
Reprint and duplication (as well as extracts) are only allowed with permission from Conductix-Wampfler GmbH.
Conductix-Wampfler GmbH 2009