Operation Manual
Track Supply 6 kW
80 / 125 A at 400 / 480 V
BAL9100-0124c-EN
www.conductix.com
Page 37 of 44
19
Disassembly / Re-use
If it is necessary to exchange the Track Supply due to damage or to install it in another place, verify that no
damage can occur during disassembly.
For installation in another place observe the described mounting and commissioning instructions. Improper
application, wrong installation or operation involves the risk of severe injuries to persons and damage to
components and equipment.
All electrical work has to be carried out by qualified staff (IEC 364 respectively. CENELEC HD 384 or DIN
VDE 0100 and IEC 664 or DIN VDE 0110 and national safety rules).
Qualified staff according to the safety regulations are persons who are familiar with the installation, assembly,
commissioning and operation of the energy supply system and who have the appropriate qualifications.
19.1
Safety advice for disassembly and disposal
1.
Disconnect unit from the mains voltage!
2.
After disconnecting the Track Supply from the supply voltage wait at least 10 minutes for internal
discharging to 60 VDC (20 minutes to < 10 VDC) before opening the Track Supply!
3.
Dismount the Track Supply!
4.
Dispose of components in a specific way.
Recycling (see chapter 19.2)
19.2
Recycling
The unit contains components that have to be disposed of in a specific way. If it is not used any longer, it
needs to be recycled properly.