Start and operation
The Track Supply is not designed for independent operation. It has to be operated in conjunction with
corresponding IPT
®
rail components. Therefore no specific details about the operation are given in this
document.
Prior to switching-on the Track Supply ensure that the installation and commissioning were executed
correctly. Always attend to the valid safety regulations!
After connecting the Track Supply to the line voltage the components of the power circuit are connected to the
voltage network. Do not touch these components.
DANGER OF LIFE!
It is therefore obligatory to keep all
doors and covers CLOSED.
Start-Sequence (remote operation):
1.
If there is an external isolator switch between the main distribution and Track Supply switch it on.
2.
Switch-on the Track Supply - “ON” on the START-input.
3.
On the display board the green “ON” LED is on.
4.
The IPT
®
System is now on.
Prior to any intervention into an electrical or mechanical component of the energy supply system the complete
system always has to be disconnected from the supply voltage!
Connecting and disconnecting measuring instruments is only allowed under off-circuit conditions and must
only be carried out by trained personnel.
Reconstruction or modifications at the energy supply system or its components on one’s own authority are
excluded from the guarantee.
Any necessary reconstructions or modifications - especially on electrical components - are only allowed if they
have been approved by Conductix-Wampfler.