Operation Manual
Track Supply 6 kW
80 / 125 A at 400 / 480 V
BAL9100-0124c-EN
www.conductix.com
Page 36 of 44
18
Repair
If repair action or replacement of faulty parts is necessary and possible on site these works have to be carried
out by trained personnel or by a Conductix-Wampfler technician, both while considering the relevant safety
regulations. If no failure analysis or repair is possible on site the faulty part has to be sent to Conductix-
Wampfler GmbH. Please inform our service department in this case for details.
To decide which procedure is the best in your case please inform us of the following:
•
Product designation
•
Material number
•
Serial number
•
Configuration details (in case)
•
Line data (technical and line-specific)
•
Wiring scheme of the line / unit (if available)
•
Pictures / photos (if available)
•
Failure description or details about the malfunction
•
Presumption for the failure analysis
The general and local safety regulations have to be observed (see chapter 10 “Installation” and chapter 11
“Warnings and cautions”).