1
warema_866217_alhb_en_v6•2022-07-01
We reserve the right to make technical modifications
General information
Fig. 1
Floor distribution control Standard (GA) Standard for
four facades
A power supply unit for supplying the control voltage of the
downstream motor control unit is integrated in the GA unit.
The GA unit can be used to operate the motor control units
of up to 4 facades either via a higher-level central control
or facade-by-facade on a floor through floor switches.
Commands of the central control take precedence over
the local floor switches and are passed on directly to the
motor control units. The local floor switches are blocked by
a central command.
Intended use
The Floor distribution control Standard (GA) Standard was
developed to control sun shading systems. The approval of
the manufacturer must be obtained for uses outside of the
purposes listed in these instructions.
Safety instructions
WARNING
The electrical installation (assembly)/dis-
mantling must be performed by a certified
electrician in accordance with the electri-
cal installation regulations published by
the Association of German Electrical Engi-
neers (VDE 0100) or the standards and reg-
ulations of the country in which the device
is being installed. The electrician must ob-
serve the installation instructions included
with the supplied electrical devices.
WARNING
If hazard-free operation cannot be as-
sumed, the device may not be started or
must be deactivated. This assumption is
justified if:
the housing or the connecting lines show
signs of damage,
the device is no longer working.
WARNING
It is important to comply with the following
points in the interest of personal safety.
■
Make sure that no persons or objects are located in the
path of any driven parts (blinds, roller shutters, etc.)!
■
Disconnect the MSE from the operating voltage if cleaning
or other maintenance work must be performed!
Electrical connection
An on-site overload current protection device (fuse) and a
disconnecting and isolating switch to switch off the entire
system must be provided.
Operating and installation instructions
GA Standard for 4 facades
Valid from
1. February 2022
Keep for future use..