Operation Manual
Track Supply 6 kW
80 / 125 A at 400 / 480 V
BAL9100-0124c-EN
www.conductix.com
Page 30 of 44
11
Warnings and cautions
All electric works have to be carried out by qualified staff (IEC 364 respectively CENELEC HD 384 or DIN
VDE 0100 and IEC 664 or DIN VDE 0110 and national safety rules).
All installation and commissioning work as well as repair work and disassembly have to be done according to
the present operation manual. The specifications of this document have to be strictly observed. In addition,
national regulations and whenever they apply regulations specific to the industry are to be taken into account.
Qualified staff according to the safety regulations are persons who are familiar with the installation,
commissioning and operation of the energy supply systems and who have the appropriate qualifications.
The Track Supply is only foreseen to be operated in conjunction with matching IPT
®
components. If you are
not sure whether components match, contact Conductix-Wampfler. Do not put into operation beforehand.
Operation of the Track Supply without all provided covers may allow the ingress of dirt and dust, thereby
reducing the ability to function reliably and within specification. Avoid operation with removed cover(s) and / or
opened door.
Tighten all cable glands at the bottom of the inner enclosure and ensure that the covers are screwed down
properly!
Although the Track Supply output is isolated from the mains supply by a transformer, the 20 kHz high
frequency output is Protective Earth referenced by Y-connected noise suppressing capacitors. This means a
potential voltage exists with respect to PE that could cause electric shock and even death in some people.
Avoid coming into contact with any uninsulated part of the primary supply. Don’t touch electrical
components in the Track Supply.
DANGER OF LIFE MUST BE AVOIDED BY IMPLEMENTING SUITABLE PROTECTION MEASURES!
Observe safety pre-cautions before and while removing any covers and housings!