Adjustments during the commissioning and start-up
Track Supply ____ A _____ V @ _____ Hz
Material-No.: _______________________________
Serial number
......................................................................................
Name of the project or line
......................................................................................
Environmental conditions on the place
......................................................................................
Following values were measured or adjusted:
Inductance without track tuning / Adjustment (µH)
......................................................................................
Inductance after track tuning / Adjustment (µH)
......................................................................................
Output voltage - track (V)
......................................................................................
Output current (A)
......................................................................................
Inverter current (A)
......................................................................................
Input line supply (V)
......................................................................................
Remarks / Hints:
................................................................................................................................................................................................................
................................................................................................................................................................................................................
Recommended date for the next inspection: ……...…………………….................................………………....................……………..
.................................
...........................................................
..........................................
Date
Name
Sign