Operation Manual
Track Supply 6 kW
80 / 125 A at 400 / 480 V
BAL9100-0124c-EN
www.conductix.com
Page 26 of 44
10.5.2
Configuration of control plug
Inputs:
/Reset
Reset+ (Pin 3) must be taken 24 V DC above Reset - (Pin 4), otherwise the Track Supply remains in a
reset state. Note to reset the Track Supply the Reset must go low for at least 0.5 seconds.
Start
24 V DC and GND may be supplied to turn the Track Supply on or off. If Start+ (Pin 1) is taken 24 V DC
above Start- (Pin 2) the Track Supply output is energized. Otherwise the outputs are disabled.
Sync
For synchronizing track supplies together to the same frequency and phase. Use only Conductix-
Wampfler approved equipment.
When using several track supplies synchronization may be required.
Both Start and /Reset inputs are optically isolated and may be connected to an external 24 V DC supply or the provided 24 V
output.
Outputs:
Error
Switch is open on error or if the mains supply is disconnected. Otherwise it is closed.
0 and 24 V May be used for control and commissioning, but must not be distributed over cables longer than 2 m.
Reference for input and output:
Do not locally distribute this 24 V DC supply output over control cables! Do not reference 0 V to other
potentials!
/Reset +
/Reset –
Output 24 V
Output 0 V
Start +
Start –
Synchro-
nization
Harting HAN-10E
1
2
3
4
8
7
9
10
Error
relay
5
6