I n s t a l l a t i o n l
3 - 5
3
Installa
tion
M o u n t i n g t h e C o n t r o l
1
Mount the control.
The HMI operator panel can be mounted on the side of the
blender chassis or it can be secured to the blender stand or the processing
machine. To mount the HMI operator panel on the blender chassis: Match the
key hole slots on the blender control with the hex head bolts on the side of the
blender. Tighten the hex head screws and tighten the lock nuts inside the blender
chassis. The controller with the support can be swiveled by 90° by loosening the
rear screw.
2
Connect the cable.
Attach the interconnecting DB25 connector cable between the HMI
(control) and the electrical cabinet. The cable connects from the back of the box to the
fitting underneath the bottom of the electrical cabinet. Tighten the screws on the plug.
Note
: If you decide to remote mount the HMI operator panel, you will need to make your
own provision to securely mount it. The control can be attached to a wall or anoth-
er position and connected with a 2 m (standard) or 6 m (optional) cable. The con-
troller can also be placed on a table and prevented from slipping with the four anti-
slip feet, which are supplied with the cable.
✐
✒
Tip:
The cable end with the wire exiting from the side should be connected to the touch
screen HMI operator panel - to allow the screen to tilt freely.
✒
Tip:
Remove the protective film on the touch screen control for optimum performance.
Содержание TrueBlend SB-4
Страница 6: ...iv l Table of Contents...
Страница 38: ...3 10 l Installation...
Страница 134: ...4 96 l Operation...
Страница 160: ...6 10 l Troubleshooting...
Страница 165: ...Appendix l C 2 Hole Locations for Blow Off Kit...
Страница 168: ...D 3 l Appendix...