3 - 4
l I n s t a l l a t i o n
P r e p a r i n g t o M o u n t t h e B l e n d e r
The blender can be mounted on the throat of the processing machine or operated as a cen-
tralized mixing station and mounted to an optional stand with a surge bin attached. A frame
with reservoir hopper and exhaust box is available if it is used as a centralized mixing sta-
tion. The frame can be bolted to the floor.
Make sure that the base is as even as possible.
Make sure that the switch cabinet and main door are accessible for maintenance work at
all times.
Match the bolt pattern on the bottom of the blender with the mounting surface. And
optional adapter is available. It may have been ordered pre-drilled or it may be blank so
that it could be custom drilled by you. Mounting interface dimensions are available in
this manual on the specification sheets. Match the through hole size on the mounting
plate with the appropriate bolt size. You are responsible for the structural integrity of your
installation. Make sure to use the largest bolt that will fit properly into the through hole.
Use the hardware supplied to bolt the blender to the stand. (The bolts you should use are
attached to the stand.)
•
•
•
M o u n t i n g t h e B l e n d e r
1
Lift the blender into position.
Using the lifting lug located at the center of the blender,
lift the blender (only) into position. This lifting lug was designed to lift the weight of the
blender only. Make sure that the blender has the mixing chamber and control removed,
that no loaders/receivers are attached, and that there is not any material in the bins.
2
Reinstall the mixing chamber.
Follow the instructions on the sticker located inside the
door on the blender chassis to reinstall the mixing chamber.
NOTE:
If your mounting surface does not match the standard bolt patterns available, you will need
an adapter. You can make an adapter using the dimensions provided or purchase one from Conair.
Contact Conair Parts at 1.800.458.1960 From outside the United States, call 814.437.6861
✐
Содержание TrueBlend SB-4
Страница 6: ...iv l Table of Contents...
Страница 38: ...3 10 l Installation...
Страница 134: ...4 96 l Operation...
Страница 160: ...6 10 l Troubleshooting...
Страница 165: ...Appendix l C 2 Hole Locations for Blow Off Kit...
Страница 168: ...D 3 l Appendix...