3 - 6
l I n s t a l l a t i o n
M o u n t i n g t h e L o a d e r s
1
Install the loaders/receivers onto the blender bins.
2
Supply power to the loader as needed.
Refer to the manual the
came with your loader for specific instructions.
3
Supply compressed air to the loader as needed.
Refer to the manual the came with
your loader for specific instructions.
4
Refer to the wiring diagrams
that were shipped with your blender and loaders.
L a y o u t o f t h e M a t e r i a l H o p p e r s
4 position
6 position
Position 1
Position 2
Position 3
Position 4
Position 1 & 2 = Main components
Position 3 & 4 = Additive components
Front door (mix chamber)
Controller location
Position 1
Position 2
Position 4
Position 5
P
o
sition 6
Position 1 & 2 = Main components
Position 3 & 6 = Main or additive
components
Position 4 &5 = Additive components
Position 3
Содержание TrueBlend SB-4
Страница 6: ...iv l Table of Contents...
Страница 38: ...3 10 l Installation...
Страница 134: ...4 96 l Operation...
Страница 160: ...6 10 l Troubleshooting...
Страница 165: ...Appendix l C 2 Hole Locations for Blow Off Kit...
Страница 168: ...D 3 l Appendix...