
I n s t a l l a t i o n l
3 - 7
3
Installa
tion
C o n n e c t i n g t h e M a i n P o w e r
The blender operates from standard 120 Volt, 60 Hz or 220 Volt, 50 Hz depending
on the option selected when purchased. You can confirm power requirements by
looking at the serial tag.
1 Plug the blender into a properly sized electrical outlet.
I n s t a l l i n g t h e W e i g h B i n
1
Visually inspect the weigh bin and the interfacing parts located on the load
cell inside the blender chassis.
2
Guide the hangers onto the interfacing part inside the blender.
NOTE:
Blenders ordered with 220 Volt will need to be wired to a discon-
nect that is protected by properly sized protectors (fuses or breaker).
✐
IMPORTANT
: Always refer
to the wiring diagrams that
came with your blender to
locate specific electrical
components. Illustrations in
the User Guide are intended
to be representative only.
CAUTION:
Always disconnect and lock out the main power sources
before making electrical connections. Electrical connections should be
made only by qualified personnel.
C o n n e c t i n g C o m p r e s s e d A i r
1
Connect the air hose [A] to the compressed air
connection of the unit [B].
Connect a clean, dry
compressed air supply to the compressed air con-
nection on the blender. You will need to supply
1/4 inch male NPT fitting to make the connec-
tion. Adjust the regulator to 90 psi.
2
Check the operating pressure with the
manometer [C] and if it is different, set it to
0.6 MPa.
A
B
C
Содержание TrueBlend SB-4
Страница 6: ...iv l Table of Contents...
Страница 38: ...3 10 l Installation...
Страница 134: ...4 96 l Operation...
Страница 160: ...6 10 l Troubleshooting...
Страница 165: ...Appendix l C 2 Hole Locations for Blow Off Kit...
Страница 168: ...D 3 l Appendix...