Power Distribution
Compatico eight-wire/four-circuit power system specifications:
o
UL-Listed/CSA-Certified
and
labeled
o
Constructed with shielded conduit
to provide an effective built-in
EMF barrier
o
Eight-wire,
four-circuit
design
o
15-amp
capacity
o
Three
general-purpose
circuits
o
One dedicated circuit with isolated ground
Compatico
AO2
and
AO
2
PolyPanel
series panels specified with power come with the power
distribution harness attached to the panel.
To connect power distribution harnesses and/or pass-thru cables together or between one or
another
1. The flexible conduit/connector is polarized so that it can only connect to the appropriate end
of a pass-thru cable or to the male terminals on the power
block of a power distribution harness (one terminal on the
male end of the connector is crowned).
If the power distribution harness needs to be removed, remove
the power block from mounting bracket, use a small prybar or
flat-blade screwdriver to press down plastic tab of power block
on either side of the mounting bracket center tab until you can
push the power block through.
2. Simply make sure the polarized ends are appropriately matched and press together. You
should hear an audible ‘click’ when they have made a proper connection. If not, please
examine carefully to make sure the two are fully connected by firmly pulling apart.
•
The shielded cable of each Power Distribution Harness and Pass Thru cable can be
stretched up to 3
” to round 90-degree corners; firmly grab shielded cable only at each
end and pull sharply until fully stretch.
•
Separate adapters (Compatico #HMP.554.0300) are required only to pass through a 3-way
or 4-way connector.
3. Follow the schematic below for routing power distribution harnesses and/or pass-thru cables
at connector junctions.
Power Distribution
Harness
Main Panel
Run—
“spine”
Main Panel
Run—
“spine”