Sea Tel 9711-56 IMA
Table of Contents
viii
EAR Controlled - ECCN EAR99
4.4.7.
Close the 144” Radome Assembly ............................................................................................ 4-23
4.5.
P
REPARING TO
H
OIST THE
ADE ............................................................................................................ 4-24
4.6.
I
NSTALLING
T
HE
ADE ......................................................................................................................... 4-25
4.6.1.
Hoist the ADE ......................................................................................................................... 4-25
4.6.2.
Connecting the ADE ................................................................................................................ 4-25
4.6.3.
Remove stow Straps ............................................................................................................... 4-26
4.6.4.
ADE Final Checks ................................................................................................................... 4-26
4.7.
I
NSTALLING THE
B
ELOW
D
ECKS
E
QUIPMENT
........................................................................................... 4-26
4.7.1.
General Cautions & Warnings ................................................................................................. 4-26
4.7.2.
Connecting the BDE AC Power Cables ..................................................................................... 4-26
4.7.3.
Media Xchange Point™ (MXP) Connections ............................................................................ 4-26
4.7.4.
Other BDE connections .......................................................................................................... 4-29
4.8.
BDE
F
INAL
C
HECKS
............................................................................................................................ 4-29
4.8.1.
Visual/Electrical inspection ..................................................................................................... 4-29
4.8.2.
Electrical - Double check wiring connections ............................................................................ 4-29
4.9.
S
ETUP
-
M
EDIA
X
CHANGE
P
OINT
™
(MXP) ............................................................................................. 4-30
4.10.
C
YBER
S
ECURITY
C
AUTION
.................................................................................................................... 4-30
5.
INSTALLATION IN 168” RADOME ................................................................................................. 5-1
5.1.
G
ENERAL
C
AUTIONS
&
W
ARNINGS
........................................................................................................... 5-1
5.2.
P
REPARATION
....................................................................................................................................... 5-1
5.3.
A
SSEMBLING THE
ADE .......................................................................................................................... 5-2
5.3.1.
Sub-assemble the Base Frame Assembly ................................................................................... 5-2
5.3.2.
Radome General Subassembly Guidance .................................................................................. 5-4
5.3.3.
Sub-assemble the 168” Radome Assembly .................................................................................5-5
5.3.4.
Installing the Marine Air Conditioner ........................................................................................ 5-14
5.3.5.
Pedestal & Reflector ................................................................................................................ 5-14
5.3.6.
Close the 168” Radome Assembly ............................................................................................ 5-23
5.3.7.
Prepare the 168” Radome ADE for Lift ..................................................................................... 5-25
5.4.
I
NSTALLING
T
HE
ADE ......................................................................................................................... 5-26
5.4.1.
Hoist the ADE .........................................................................................................................5-26
5.4.2.
Connecting the ADE ................................................................................................................5-26
5.4.3.
Remove stow Straps ................................................................................................................ 5-27
5.4.4.
ADE Final Checks .................................................................................................................... 5-27
5.5.
I
NSTALLING THE
B
ELOW
D
ECKS
E
QUIPMENT
............................................................................................ 5-27
5.5.1.
General Cautions & Warnings .................................................................................................. 5-27
5.5.2.
Connecting the BDE AC Power Cables ...................................................................................... 5-27
5.5.3.
Media Xchange Point™ (MXP) Connections ............................................................................. 5-27
5.5.4.
Other BDE connections ........................................................................................................... 5-30
5.6.
BDE
F
INAL
C
HECKS
............................................................................................................................. 5-30
5.6.1.
Visual/Electrical inspection ...................................................................................................... 5-30
5.6.2.
Electrical - Double check wiring connections ............................................................................. 5-30
5.7.
S
ETUP
-
M
EDIA
X
CHANGE
P
OINT
™
(MXP) ............................................................................................. 5-31
5.8.
C
YBER
S
ECURITY
C
AUTION
.................................................................................................................... 5-31
6.
CONFIGURING A COMPUTER FOR THE MXP .................................................................................. 6-1
6.1.
C
YBER
S
ECURITY
C
AUTION
..................................................................................................................... 6-6
7.
SETUP – SHIP’S GYRO COMPASS .................................................................................................. 7-1
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......