Installing The ADE
WARNING:
Hoisting with other than a webbed four-part sling may result in
catastrophic crushing of the radome. Refer to the specifications and drawings for
the fully assembled weight of your model Antenna/Radome and assure that
equipment used to lift/hoist this system is rated accordingly.
CAUTION:
The antenna/radome assembly is very light for its size and is subject
to large swaying motions if hoisted under windy conditions. Always ensure that
tag lines, attached to the radome base frame, are attended while the antenna
assembly is being hoisted to its assigned location aboard ship.
5.4.1.
Hoist the ADE
1.
Assure that the antenna is stowed/restrained before hoisting.
2.
Using the lifting harness arrangement previously described hoist the antenna assembly to
its assigned location aboard ship by means of a suitably-sized crane or derrick.
3.
The radome assembly should be positioned with the BOW marker aligned as close as
possible to the ship centerline. Any variation from actual alignment can be compensated
with the AZIMUTH TRIM adjustment in the antenna control unit, so precise alignment is not
required.
4.
Bolt, or weld, the feet of the base frame to the mounting surface aboard the ship.
5.4.2.
Connecting the ADE
Refer to the System Block diagram, the Antenna Schematic and the general strain relief installation
information in the drawings section of this manual.
Sea Tel recommends that separate, dedicated, 220 VAC Power be provided for the Marine Air
Conditioner. This cable and breaker must be properly rated for the 18 AMP Inrush/Startup current
of this device. Do NOT combine this with the AC Power provided for the Antenna Pedestal and RF
Equipment.
1.
Install strain reliefs in the desired locations of the base pan where the cable will enter the
radome.
2.
Route each cable through a strain relief to it’s connection point. We recommend that you
leave a little excess service length on each cable (this can be left inside the louvered panels
of the AZ Post).
3.
Remove the AFT louvered panel for access to the breaker and coax interconnect bracket.
4.
Connect the Pedestal & RF Equipment AC Power Cable into the breaker box in the AFT
louvered panel. Conductors are to be connected as shown on the Antenna Schematic
(bottom left). The other end of the AC Power cable must be connected to a suitably rated
breaker or UPS.
5.
If a Marine Air Conditioner is installed: Route the dedicated, AC Power cable provided for
the Marine Air Conditioner to its external transformer on into the Marine Air Conditioner
and terminated to the AC terminals inside.
6.
Connect the ADE AC Power Cable into the breaker box in the AFT louvered panel.
Conductors are to be connected as shown on the Antenna Schematic (bottom left). The
other end of the AC Power cable must be connected to a suitably rated breaker or UPS.
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......