Sea Tel 9711-56 IMA
Installation in 144” Radome
4-13
EAR Controlled - ECCN EAR99
47.
Carefully guide the cables &
isolation spring down
through the top of the Az
post as the pedestal &
reflector assembly is
lowered.
48.
Hold the pedestal & reflector
assembly just above the top
of the AZ Post.
Rod End Assembly
Isolation Assembly
Left side of AZ Post
49.
Rotate the isolation section
of the pedestal to align the
rod end assembly to be to
the port side (left as viewed
if you are standing AFT of
the pedestal) of the AZ Post.
50.
Align the 4 mounting holes
in the lower isolation plate
to the holes in the top of the
AZ Post.
51.
Lower the pedestal &
reflector assembly to be on
the top of the AZ Post,
52.
Apply Loctite to and install
the 4 mounting bolts up
through the top of the AZ
Post & lower isolation plate.
53.
Install 4 flat washers & hex
nuts on the bolts and tighten
to torque spec.
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......