Sea Tel 9711-56 IMA
Installation in 168” Radome
5-7
EAR Controlled - ECCN EAR99
15.
To provide a clean caulked seam
all around the panels: apply
painters masking tape to the
outside perimeter of each of the
panels about ¼ “ from the top,
bottom, left and right edges at
each flange joint. The tape will
be removed just before the
radome caulking has had time
to set.
NOTE: It is extremely important to
assure that the flanges are properly
aligned before the bolts are tightened
and kept in alignment as the hardware is
aligned. This is necessary for the inside
clearance and the outside aesthetic
appearance of the radome. Please note
this picture shown good alignment as
observed from inside the radome and
below a picture of flanges with bad
alignment.
Good flange alignment
Bad flange alignment
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......