Installation in 168” Radome
Sea Tel 9711-56 IMA
5-16
EAR Controlled - ECCN EAR99
6.
Cut the bands from and
remove the C-band feed,
Antenna Control Unit and
below decks kit boxes.
7.
Move the Antenna Control
Unit and below decks kit
boxes to a location where
they will be protected until
you are ready to install the
below decks equipment.
8.
Cut the bands from and
remove the Louvered
panels.
9.
Set these aside in a
protected location until you
are ready to install them.
10.
Cut the bands from and
remove the counter-weight
and hardware boxes.
11.
Set the counter-weight box
aside in a protected location
until you are ready to
rebalance the antenna.
12.
Remove the 4 lag bolts from
the spider legs that are
farthest from the edge of
the pallet.
13.
Bolts with Nyloc nuts are up
through the pallet and
spider legs that are closest
to the edge of the pallet.
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......