Sea Tel 9711-56 IMA
Installation in 144” Radome
4-7
EAR Controlled - ECCN EAR99
2.
Remove the screws around
perimeter of the 3 remaining
sides at the base of the
crate.
3.
To avoid damaging the feed
or waveguide, tilt the open
end of the top of the crate
up.
4.
Continue to tilt the top of
the crate up off the pallet
and lay it on its’ back.
5.
Move the top of the crate
away from the work area.
6.
Cut the bands from and
remove the C-band feed,
Antenna Control Unit and
below decks kit boxes.
7.
Move the Antenna Control
Unit and below decks kit
boxes to a location where
they will be protected until
you are ready to install the
below decks equipment.
8.
Cut the bands from and
remove the Louvered
panels.
9.
Set these aside in a
protected location until you
are ready to install them.
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......