Installation in 144” Radome
Sea Tel 9711-56 IMA
4-14
EAR Controlled - ECCN EAR99
54.
Locate the louvered panel
which has the breaker box
mounted in it (this is the AFT
panel).
55.
Set it in place at the AFT
section of the AZ Post.
56.
Connect power to breaker
by mating the power plugs.
57.
Attach the Ground wire to
the burnished threaded hole
is the AZ Post leg.
58.
Mount the panel using
hardware provided (leave all
screws lose at this time).
59.
Connect TXIF and RXIF coax
cables to the coax
interconnect bracket inside
the legs of the AZ post.
60.
Install the 3 other louvered
panels using hardware
provided.
61.
Tighten all panel mounting
hardware.
62.
Install ratchet straps
(provided in the antenna
stow kit) by hooking into the
elevation beams and the
spider.
63.
Tighten straps to restrain
movement of the antenna.
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......