Installation in 168” Radome
Sea Tel 9711-56 IMA
5-20
EAR Controlled - ECCN EAR99
38.
Remove the 4 bolts in the U-
bracket that restrains the
Right side (shown) of the
cross-level beam.
39.
Remove the 4 bolts in the U-
bracket that restrains the
Left side (hidden in
foreground) of the cross-
level beam.
40.
Remove the foam padding
from both sides of the cross-
level beam.
41.
Discard this hardware.
42.
Pass lifting straps through
eyes in the top of the cross-
level beam. These starps
must be long enough to
clear the top of the
waveguides (as seen in the
next picture).
43.
Attach these 2 straps to a
crane or orther suitable
lifting mechanism.
44.
Slowly & carefully lift the
pedestal & reflector
assembly up, guiding the
spring and cables, up out of
the wooden frame.
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......