Installation in 168” Radome
Sea Tel 9711-56 IMA
5-24
EAR Controlled - ECCN EAR99
NOTE: It is extremely important to assure
that the flanges are properly aligned
before the bolts are tightened and kept in
alignment as the hardware is aligned. This
is necessary for the inside clearance and
the outside aesthetic appearance of the
radome. Please note this picture shown
good alignment as observed from inside
the radome and below a flange with bad
alignment.
Good flange alignment
Bad flange alignment
4.
Use wedges to lift the upper
panels off of the lower panels
about ½ inch.
5.
Install a good bead of caulking
between the bottom of the upper
panels and the top of the lower
panels, remove the wedges and
radome lifting brackets, then
firmly tighten all the bolts
(smaller dual beads of caulking
can be applied from outside and
inside if you prefer).
Содержание Sea Tel 9711-56 IMA C Band
Страница 12: ...Safety Sea Tel 9711 56 IMA 1 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 24: ...Site Survey Sea Tel 9711 56 IMA 3 8 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 122: ...Quick Start Operation Sea Tel 9711 56 IMA 14 6 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 128: ...Installation Troubleshooting Sea Tel 9711 56 IMA 16 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 146: ...Stowing the Antenna Sea Tel 9711 56 IMA 18 4 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 160: ...Drawings Sea Tel 9711 56 IMA 20 2 EAR Controlled ECCN EAR99 This Page Intentionally Left Blank...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 201: ...INSTRUCTION NUMBER REV 97 156574 B SHEET 3 OF 4 STEP 3 STEP 4 E INSTALL ROTARY JOINT F INSTALL POLANG MOTOR ASSY...
Страница 213: ......
Страница 214: ......
Страница 225: ......
Страница 226: ......
Страница 233: ......
Страница 234: ......