Step 10
Align the screw holes with the screw holes of the left top air deflector and the chassis (see Diagram 4 of
Step 11
Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m). See Diagram 4 of
Figure 37: Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration- Front Position
Step 12
Place the right front air deflector flush against the right side of the chassis (see Diagram 1 of
Step 13
Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis.
Step 14
Insert M4 pan-head screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 15
Place the mounting bracket flush in the middle position on the right front air deflector (see Diagram 2 of
).
Step 16
Align the screw holes on the mounting bracket with the screw holes on the right front air deflector .
Step 17
Insert M4 flat-head screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 18
Place the left top air deflector flush against the left side chassis as shown in Diagram 3 of
.
Installing the ONS 15454 M6 Shelf
41
Installing the ONS 15454 M6 Shelf
DLP-G565 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration