•
• Plug one connector into the MSM port of the subtending ONS 15454 M6 shelf that corresponds
to the TNC/TNCE/TSC/TSCE card in Slot 8.
• Plug the other connector into Port 2 of the standby Catalyst 3560.
c) Repeat Steps 4a and 4b for each subtending shelf in the multishelf configuration using Port 3 to Port 20
on the Catalyst 3560 switches.
Step 5
To connect an ONS 15454 subtending shelf to the Catalyst 3560 switches, complete the following:
a) Using a cross-over (CAT-5) LAN cable:
•
• Plug one connector into the front panel of the subtending shelf TCC2/TCC2P/TCC3 card in
Slot 7.
• Plug the other connector into Port 2 of the active Catalyst 3560.
b) Using a cross-over (CAT-5) LAN cable:
•
• Plug one connector into the front panel of the subtending shelf TCC2/TCC2P/TCC3 card in
Slot 11.
• Plug the other connector into Port 2 of the standby Catalyst 3560.
c) Repeat Step 5a and 5b for each subtending shelf in the multishelf configuration using Port 3 to Port 20
on the Catalyst 3560 switches.
Step 6
To daisy chain up to six Catalyst 3560 switches, use a cross-over (CAT-5) LAN cable to connect Port 21 of
switch 1 to Port 21 of switch 3 and Port 21 of switch 2 to Port 21 of switch 4. Use another cross-over (CAT-5)
LAN cable to connect Port 22 of switch 3 to Port 22 of switch 5 and Port 22 of switch 4 to Port 22 of switch
6.
Installing the ONS 15454 M6 Shelf
147
Installing the ONS 15454 M6 Shelf
DLP-G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf Configuration