Figure 23: Installing the right vertical air plenum
Step 7
Place the horizontal plenum above the chassis slot in the ETSI cabinet.
Step 8
Install the wing head screws provided with the kit, and tighten to a torque value of 11.5 in-lb (1.3 N-m)..
Figure 24: Installing the horizontal air plenum above the vertical plenums
Step 9
Install the standard brackets on both sides of the chassis in front position. See
Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page 34
Step 10
Check the length between the top and bottom horizontal air plenums where the chassis will be installed. The
length must be not less than 10.5 inches (267 mm). If the length is less, adjust the position of the top horizontal
plenum.
Installing the ONS 15454 M6 Shelf
22
Installing the ONS 15454 M6 Shelf
DLP-G769 Install Air Plenum for ONS 15454 M6 Shelf in ETSI Configuration