DLP-G574 Turn On and Verify AC Office Power on the ONS 15454 M6 Shelf
This task turns on and verifies AC office power on the ONS 15454 M6 shelf.
Purpose
Voltmeter
Tools/Equipment
•
NTP-G252 Install the ONS 15454 M6 Shelf , on page 24
•
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6
Shelf , on page 57
.
• Connect the chassis to the office ground. For detailed instructions on how
to ground the chassis, see the
Electrostatic Discharge and Grounding Guide
for Cisco CPT and Cisco ONS Platforms
.
•
NTP-G524 Install the Power Modules in the ONS 15454 M6 Shelf , on page
85
•
DLP-G571 Connect Office Power (AC) to the ONS 15454 M6 Shelf, on
page 103
Prerequisite Procedures
Required
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Do not apply power to the shelf until you complete all the installation steps.
Caution
To ensure safety of personnel and equipment, do not connect any power cables into the power module
until the module is completely installed into the chassis.
Statement 389
Warning
To reduce the risk of electric shock, switch on the power only after the power cord is completely installed
into the power module.
Statement 390
Warning
Procedure
Step 1
To power up the node, insert the fuse into the fuse position according to site practice. The fuse rating must
not exceed 20A.
Step 2
If the ONS 15454 M6 does not power up, check the voltage at the power source using a voltmeter. The voltage
should be 100 to 240 VAC +/-10 percent.
Step 3
Return to your originating procedure (NTP).
Installing the ONS 15454 M6 Shelf
115
Installing the ONS 15454 M6 Shelf
DLP-G574 Turn On and Verify AC Office Power on the ONS 15454 M6 Shelf