The ECU module, power modules, LCD and the fan-tray assembly can be installed in any order.
Note
Step 2
Complete the
DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections, on page 157
Step 3
Complete the
DLP-G579 Measure DC Voltage on the ONS 15454 M6 Shelf, on page 157
.
Step 4
Continue with the
Connect the PC and Log into the GUI
document.
Stop. You have completed this procedure.
DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections
Use this task to inspect the shelf installation and connections and verify that
everything is installed and connected properly.
Purpose
None
Tools/Equipment
None
Prerequisite
Procedures
Required
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Procedure
Step 1
Make sure all external wiring connections on the ECU module (that is, power, ground, alarms, and so on) are
secure. If a wire or cable is loose, return to the appropriate procedure in this chapter to correct it.
Step 2
Return to your originating procedure (NTP).
DLP-G579 Measure DC Voltage on the ONS 15454 M6 Shelf
Use this task to measure DC voltage on the ONS 15454 M6 shelf.
Purpose
Voltmeter
Tools/Equipment
Before installing the DC power, check the voltage
Prerequisite Procedures
Required
Required/As Needed
Onsite
Onsite/Remote
None
Security Level
Installing the ONS 15454 M6 Shelf
157
Installing the ONS 15454 M6 Shelf
DLP-G578 Inspect the ONS 15454 M6 Shelf Installation and Connections