5-19
Cisco MGX 8850 (PXM1E/PXM45), Cisco MGX 8950, Cisco MGX 8830, and Cisco MGX 8880 Configuration Guide
Release 5.0.10, OL-3845-01 Rev. B0, August 16, 2004
Chapter 5 Preparing SRM Cards for Communications
Where To Go Next
Where To Go Next
When your line configuration is complete and links have been established (if using bulk distribution),
you are ready to start provisioning connections. To provision connections on a particular service module,
you need to refer to the appropriate software configuration guide (see
).
21
1
7
3
53
3
7
2
22
2
1
1
54
3
1
2
23
2
2
1
55
3
2
2
24
2
3
1
56
3
3
2
25
2
4
1
57
3
4
3
26
2
5
1
58
3
5
3
27
2
6
1
59
3
6
3
28
2
7
1
60
3
7
3
29
2
1
2
61
3
1
3
30
2
2
2
62
3
2
3
31
2
3
2
63
3
3
3
32
2
4
2
Table 5-9
SRM SDH AU4 TUG-3, TUG-2, and TU/VC Mapping (continued)
SRME Link
Number
TUG-3 No.
TUG-2 No.
TU-12/VC-1
2 No.
SRME Link
Number
TUG-3 No.
TUG-2 No.
TU-12/VC-1
2 No.