
5-74
Catalyst 4500 Series Switch, Cisco IOS Software Configuration Guide - Cisco IOS XE 3.9.xE and IOS 15.2(5)Ex
Chapter 5 Configuring Virtual Switching Systems
In-Service Software Upgrade (ISSU) on a VSS
Perform the following steps at the active supervisor engine:
This example shows how to initiate an ISSU upgrade process using the
issu changeversion
command.
The outputs of the
show switch virtual
,
show issu state detai
l,
show redundancy
, and
show
redundancy states
commands are included to show the supervisor state before and after the upgrade
procedure.
Switch>
enable
Switch#
show switch virtual
Switch mode : Virtual Switch
Virtual switch domain number : 16
Local switch number : 1
Local switch operational role: Virtual Switch Active
Peer switch number : 2
Peer switch operational role : Virtual Switch Standby
Switch#
Switch#show redundancy states
my state = 13 -ACTIVE
peer state = 8 -STANDBY HOT
Command or Action
Purpose
Step 1
Switch>
enable
Enables privileged EXEC mode.
Enter your password if prompted.
Step 2
Switch#
issu changeversion
[
active-slot
active-image-new
]] [
standby-slot
[
standby-image-new
]] [
at
hh:mm
|
in
hh:mm
]
[
quick
]
Initiates a single-step complete upgrade process cycle.
Performs the logic of the four standard commands (issu
loadversion, issu runversion, issu acceptversion, and issu
commitversion) without user intervention.
active-slot—
Defines the active slot number (the Virtual slot
number). Use the
show switch virtual slot-map
command
to determine the virtual slot number from the physical slot
number.
new-image—
Specifies IOS XE image URL to be upgraded
to.
standby-slot—
Defines the standby slot number (the Virtual
slot number).
standby-image—Specifies the
standby IOS XE image URL.
at
hh:mm—
Schedules an ISSU upgrade to begin in the future.
Provides an exact time (
hh
:
mm
, 24 hour format) in the next 24
hours when the upgrade will occur.
in
hh:mm—
Schedules an ISSU upgrade to begin in the
future. Provides the number of hours and minutes (
hh
:
mm
format) that will elapse before an upgrade will occur (99:59
max).
quick
—Upon switchover, boots the standby supervisor
engine with the new, rather than old, image for faster
upgrade.
Step 3
Switch#
show issu state
[
detail
]
Displays the state of the during the ISSU process. At this
point in the ISSU process, use this command to check that
the standby supervisor engine is loaded and is in SSO mode.
Step 4
Switch#
show redundancy
[
states
]
Displays redundancy facility state information.
Содержание Catalyst 4500 Series
Страница 2: ......
Страница 4: ......
Страница 2086: ...Index IN 46 Software Configuration Guide Release IOS XE 3 9 0E and IOS 15 2 5 E ...