![Cerus Industrial Titan CI-001-GS2 Скачать руководство пользователя страница 144](http://html1.mh-extra.com/html/cerus-industrial/titan-ci-001-gs2/titan-ci-001-gs2_installation-operation-and-maintenance-manual_2583981144.webp)
13-3
13.3.2 Computer and inverter connection
System configuration
- The number of drives to be connected is up to 31 drives.
- The specification of length of communication line is max. 1200m. To ensure stable communication,
limit the length below 700m.
- Make sure JP1 located on the PWB over S+, S- terminal is to be shorted.
13.4 Operation
13.4.1 Operating steps
z
Check whether the computer and the inverter are connected correctly.
z
Turn ON the inverter. But do not connect the load until stable communication between
the computer and the inverter is verified.
z
Start the operating program for the inverter from the computer.
z
Operate the inverter using the operating program for the inverter.
z
Refer to “13.8 Troubleshooting” if the communication is not operating normally.
*User program or the “DriveView” program supplied from CERUS can be used as the operating
program for the inverter.
3&
56
Содержание Titan CI-001-GS2
Страница 1: ...D GS S Compact Space Ve VFD Frequency and 5 5 5 5 8...
Страница 13: ...1 4 Notes...
Страница 16: ...2 3 2 2 Dimensions CI 002 GS2 4 CI 001 GS2 4...
Страница 17: ...2 4 CI 003 GS2 4 CI 005 GS2 4 CI 007 GS2 4 CI 010 GS2 4 H W D W1 A A H1 W1 B B...
Страница 19: ......
Страница 25: ...3 6 5 5 7 5 kW 5 5 mm2 M4 3 5 mm2 M4...
Страница 45: ...6 4 Notes...
Страница 68: ...CHAPTER 8 CONTROL BLOCK DIAGRAM m G k G h Vk Vm w t t...
Страница 71: ...8 4 Notes...
Страница 119: ...10 26 Notes...
Страница 141: ...12 10 Ex 2 100 2 _ _ 1 _ _ _ 76 u steady T acc T steady T dec T dec T H m U X Y...
Страница 159: ...13 18 Notes...
Страница 169: ...15 4...
Страница 170: ...15 5 Notes...
Страница 171: ......